Home
About Us
Company Profile
History
Corporate Culture
Honors & Qualifications
Social Responsibility
Our Team
Manufacturing
Equipment
Flotation
Magnetic Separation
Grinding
Metallurgical
Thickeners
Intelligence
Environmental Protection
Laboratory
Spare Parts & Services
Spare Parts
Process Optimization & Recovery Improvement
Technical Value-Added Services
Energy-Saving Retrofits & Upgrades
Full Lifecycle Services
Repair & Maintenance
Typical Projects
Non-ferrous Metal Mines
Ferrous Metal Mines
Non-metallic Mines
News
Contact Us
搜索
CH
EN
PY
FR
ES
Home
About Us
Equipment
Spare Parts&Services
Typical Projects
语言
CH
EN
PY
FR
ES
Classic Cases
2CTF1030 (1,050x3,000 mm) Double-Drum Dry Magnetic Separator Applied in the Pre-selection and Waste Rejection Stage after High-Pressure Grinding Roll at a Mine in Luanping.
Date Published:
2026-04-02
Views:
At SIMEC Mining, Australia: After High Pressure Grinding Roll (HPGR), the addition of BGRIMM-MAT's CTF1240 modular complete dry separation equipment achieved a waste rejection rate of over 30%, with a concentrate mFe recovery rate greater than 98%.
没有了
Back to List
警告弹窗